trail work
Plenty of trail news from this past week. Find a comfortable spot, grab your favorite beverage, and read on...
1 - Trail Conditions
Fall colors are very good right now. Ignore the damp weather and go hike the Hills. The trails are firm, well mowed, and a great place to unwind. Be sure to wear a bit of blaze orange: it's archery season for deer, there's a youth deer gun hunt this weekend, bear season is winding down, and various bird hunts are taking flight.
2 - Work Day results
Our Annual Trail Work Day (Saturday morning, Sept 28) was attended by 15 volunteers, and their 40+ hours of work accomplished a lot - THANKS! Kneeling in the group photo below are Tom Paulsen, Sam Behrends, Ben Behrends, Jenna Behrends; standing are Tom Ralston, Lori Larsen, John Ziemer, Paul Johnston, John Olson, Irene Olson, Mike Cragg, and John Hinde; photo take by Jan Paulsen; missing from the photo are Frank Lowry and Kate Plachetka. Their accomplishments:
- As the above photo shows, we like to start 'em young. An eager two-year-old makes a good helper when cleaning the roof on the warming house.
- We brushed and cleared branches and windfalls from about 70% of the trail system.
- Two East Side bridges had their lifespan extended by adding fill and/or riprap rock where it had disappeared.
- Trenched a 30-foot section at the edge of an East Side trail to help channel water off the trail.
- On the East Side ridge-line, saved a culvert by exposing a hidden bypass water channel - filling it with rock then topping with soil.
- Cleaned interior and exterior of warming house.
- Stuffed gaps in the warming house logs with wool batting.
- Caulked cracks on top surfaces of warming house logs (to avoid standing water).
- Caulked a gap in the soffit.
- Removed dirt adjacent to the foundation, wire brushed the exposed pink foam insulation, painted the foam with a foundation protector, then replaced the dirt.
3 - Camoplast tracks - SOLD!
The evening of Sunday, September 29th we posted an ad to sell our old set of Camoplast tracks that were installed on the Gator in 2014. The listing appeared on Craigslist and Facebook Marketplace. Already Monday morning there was a big response, and the tracks sold the next day (the 30th) to the first person to inspect them. We're now running the Gator with a new and improved set of Camoplast (Camso) tracks. Your financial support keeps things running smoothly!
4 - Busy Beavers
In mid August, when performing touch-up mowing on the West Side, we were stunned by the amount of recurrent and new beaver activity that was flooding the trails. As of this past week, with a little help from our friends, the beavers have vacated the premises, water levels have dropped, and trails appear usable. Over the past several years, West Side beaver flooded trails have been a persistent and worsening problem. To address this, we met with the Rusk County Forestry department; and at their September departmental meeting, we were granted permission to close off and groom Excelsior Road during the winter months. In the future, if we need to abandon certain West Side trails, we can instead use Excelsior Road (this is the road we all use to access the West Side trailhead) as an option for skiing routes that wouldn't be impacted by beaver activity. In fact, there's a pending West Side timber sale that will eventually create a hauling road that could connect the Lollipop Loop (near Letter E) with Excelsior Road. Check out the West Side map, and use your imagination - this could develop into a very good ski trail, similar to our favorite 'Gravel Road' on the East Side. We'll see how this develops as the winter progresses.
5 - East Side logging
Take a look at the map (below) that shows a Timber Sale that impacts the East Side of the trail system. On our East Side map, the active logging is south of Rut Road between 20-21-22, and on either side of Hemlock Canyon from 21-A4. We were expecting this timber sale to be logged during the winter, thus disrupting our East Side core loop - but good news! I hiked in that area a few days ago, and quite a bit of that sale has been logged. Most of the logging is a 'select cut' which leaves a beautiful hardwood forest standing. Kudos to the County Foresters for preserving a buffer for the ski trail, and for preserving the beauty of the forest. A few pictures (below) were taken on the lower portion of Rut Road to show you why you should avoid this fairly muddy area when hiking this fall. And prepare for a different vista - as you ski toward the warming house down the long gradual downhill that is Rut Road, at the spot where you bank off Rut Road, there now is a clearcut in the distance - as shown in the photo. And compare the 2013 photo of the skier with the last photo that shows essentially the same corner as you bank off Rut Road. We'll try to put up some signage in that area to make sure folks stay oriented. (Note: Loggers are expected to ditch and smooth the trails once they're done.)
6 - November 2nd Fundraising Banquet
Our guest speaker at this year's fundraising banquet is Birkie Founder and Legend... Ernie St. Germaine! If you've already registered, help spread the word. You can find a banquet link on our home page on your computer or smartphone.
Picture(s) with this message were taken late September.



Our 2014 John Deere Gator 825i went to the beauty shop today. It's time for its annual preventive maintenance -- and if you missed an earlier message -- the original Camoplast tracks that we mounted on the Gator in 2014 have worked hard for 1200 hours (7500 km) and are being replaced with new upgraded tracks. The old tracks will be put up for sale and provide many additional hours of service.
We've seen online videos of the new tracks, endorsing the improvements that were introduced in 2017. But today was the first time we've seen the redesigned tracks in person. And wow! are they impressive!
Not by choice, several of us involved with maintaining the Gator have become well acquainted with the original tracks. Since we purchased the Gator in 2014, most of its mechanical problems have been related to issues with the tracks. The new tracks have a tougher frame, improved mechanisms for adjusting track tension and alignment, improved ability to float over the trail surface, an even better rubber track, and a better system for lubricating the main hub bearings.
Seeing is believing. The following pictures show the Gator (with the original tracks) getting a shower; and the new tracks fresh from Canada.
Somewhat cooler weather has suppressed the bugs. This is a good time to enjoy our 20+ miles of non-motorized trails. The last photo shows folks 'Out There' near intersection A5 on the East Side. As a reminder, on the East Side, this fall you probably should avoid Rut Road (logging activity); on the West Side, the trail is currently flooded and impassable near Letter F, and between K-L -- busy little beavers.
If needed, click here for a link to our Trail Maps.
Picture(s) with this message were taken late August.


After a lot of thought, time and effort, our idea of revising the Eastside map and trail signs is close to becoming reality. Our current (old) map defies logic and is too confusing. Our volunteer traffic engineer (he lives in Portland, OR) is close to finalizing the details on the new Eastside map.
Once the map is ready to go, we'll send it to the printers where the maps will be laminated. The ALL NEW TRAIL SIGNS (165 directional signs!) were printed in August using a heavy gauge aluminum material with a reflective yellow coating - they're waiting to be put in place. Soon we'll need a few volunteers to remove the old maps and signs, and put up the new. Watch for an email message seeking volunteers for that task.
This past weekend, we couldn't help jump starting the process of erecting the new signs. With rain in the forecast, we decided to go ahead and put up the new maps and signs on the trails furthest from the warming house that tend to become soft and muddy during damp weather. New signage was placed yesterday on most of the intersections on the trails named "Far East" and "Otter Slide".
Each intersection requires one map, one sign with the 'number' of that intersection, and each diverging trail receives one sign that identifies where that trail is headed. There are 45 intersections on the Eastside. That equals lots of maps and directional signs. Follow this link to view the new maps. Take a few minutes to appreciate the many features of the map. Here are just a few...
- You'll notice the core loop is a bold black line that's numbered sequentially using blue highlighted circles.
- If you look carefully, you'll find kilometer markers at each km along the 11 km length of the core loop. (While we were zooming around the trails this weekend, we also put up the necessary posts with their km markers along the core loop.)
- When you venture off the core loop, you'll see that all the side trails have names; and their intersections are grouped into A1-A5, B1-B5, and C1-C7 based on proximity.
- We've already marked and signed the intersections that will be developed when the 'FAR EAST' trail is completed.
- Instead of a red dot to show 'You Are Here' we've switched to red arrows.
- We've even designed the map to be functional for individuals that are red/green color blind.
Overall the trails are in great shape. Bug activity is low, fall colors are exploding, this is a great time to enjoy the trails!

Whew! Our annual trail work day accomplished a lot. Over the first weekend in October (Friday/Saturday/Sunday) twelve volunteers each donated several hours of their time. With the goal of having safe clear passages for skiing, they...
- Chainsawed about 25 trees for removal (a localized storm on September 22 produced fairly widespread damage to our trail system)
- Removed fallen trees, limbs, and branches; and bothersome rocks
- Brushed the trail margins to maintain wide passages for skiing
- Shoveled to create a smooth ramp approach for the bridge at #31
- Filled a section of eroded areas with ten straw bales that were separated, compacted and retwined
- Shoveled to fill eroded segments adjacent to straw bales
- Felled trees to serve as "corduroy" at a deep eroded trench
- Moved lumber in anticipation of bridge repair
- Placed reinforcement cable at our bridge that is undergoing repair
- Broomed off the roof of the warming house
We're very pleased to have that above list out of the way. Many thanks to the helpers this past weekend: Dan Bale, Mike Cragg, Ron Jasperson, Shane Klein, Peter Neal, Jan Paulsen, Tom Paulsen, Steve P, Jerry Schneider, Jason Sirek, John Waldron, and Jerry Wilkes. And a huge thank you to all of you that have helped with the many tasks this past summer (mowing, tree removal, equipment repair, equipment storage, eradicating carpenter ants, fixing the doors of the warming house, etc). If we tried to list all your names, we'd miss some. Please know that your volunteer efforts are greatly appreciated!

The Blue Hills Trail -- entirely non-motorized -- has more than 20 miles of trails that require year round maintenance. Our most important bridge was heavily damaged in a late May deluge, then dismantled in August while staging the repair. Every picture tells a story: the attached photos first show the damaged bridge; then show the workers on the 14th of September when the bridge was rebuilt (bridge building photos courtesy of Dan Bjugstad); and some modifications from the workday on October 1st. Thanks to these guys for rebuilding the bridge: Dan Bjugstad, Mike Cragg, Ron Jasperson, Frank Lowry, & John Waldron. Thanks to Lamperts of Ladysmith for donating the lumber for the stringers. This bridge (as well as another bridge and several culverts) received quite a bit of attention during the annual work day on October 1st. The trails are shaping up now as we enjoy fall and look forward to winter skiing.Many many thanks to our numerous volunteers!


















Cross country skiing on a wide, smooth, beautifully groomed ski trail is a pure delight. Recently (probably the weekend of October 10-11) a truck illegally drove on a significant portion of the core loopf the Blue Hills Trail and created deep ruts on these soft, damp, and muddy sections that are prone to erosion. We'd like your help catching this person. Please read on.
Photos (below) show some of the damage, as well as the route traveled. It's been an incredibly wet summer here in the Blue Hills. So... imagine driving your truck on really soft ground just after the frost is out, and that's an example of some of the damage. To access this non-motorized trail and create this damage required:
- Driving past an official "No ATV" sign
- Driving through a route used by an active logging operation
- Driving around a Rusk County Forestry gate
- Removing encroaching brush on a rarely traveled logging 'road'
- Driving past a non-motorized sign at the boundary of the trail system
- Driving on a long section of smoothly-mowed, wide trail while creating deep ruts (section 24-3 on map)
- Passing two more non-motorized signs (at map points 4 & 5)
- Driving on 100 meters of a very soft section of trail (trail section 5-9), creating very deep ruts, then turning around
- Then driving 80 meters on a different even softer muddy trail section (trail section 5-6), creating even deeper ruts, and turning around
- Leaving by the same route used to access the trails
Make no mistake. This damage was not the result of a logger accidentally driving off course; or a County Forester out marking trees. This driver was way out of bounds, and clearly knew the actions were illegal. Keep your ear to the ground. Perhaps we can catch the responsible party. Any information should be reported to the Rusk County Sheriff's department: 715-532-2200. Or contact the Blue Hills Trail Association Inc (BHTA) at bluehillstrail@gmail.com. The BHTA is currently working with the Rusk County Forestry department and the Wisconsin DNR to help repair the damage prior to ski season.




Each autumn, the Blue Hills Trail Association Inc coordinates a single work day to prepare the Blue Hills Trail for the coming winter cross country ski season - and fall hunting. After working hard to mow and maintain the trails through a very wet summer, this morning the work day crew was greeted by brilliant sunshine and a nice display of fall colors. The trails are well mowed and providing good hiking even though somewhat damp. On October 1st, two of our volunteer members already spent the day aggressively brushing out the Westside trails - helping set the stage for the official work day. Then this morning, one of our best ever work day turnouts showed seventeen hardy souls ready to go at 9 a.m. After a brief planning session in the warming house, we split up into seven different groups, and each of us spent about three hours on trail work (that's about 51 hours of total labor if you're counting). Today's accomplishments:
- Cleared the entire Westside of remaining brush and encroaching limbs; placed all new maps at each of the Westside intersections (highlighting the fact that the Westside is now non-motorized).
- Cleared the 12km EastSide core loop (and adjacent trails) of rocks, downed limbs and encroaching branches.
- Removed a big logjam from under one large bridge; reinforced a couple bridges.
- Trenched an area of standing water to better promote drainage off the trail.
- Identified some additional downed trees in need of chainsaw work.
- Cleared 2/3 of the snowshoe trail of encroaching limbs and downed trees; placed brand new easily identifiable signs along the snowshoe trail.
- Relined the urinal in the men's pit toilet.
- Tidied the warming house: washed the warming house windows and skylights; cleaned the tables; cleared pine needles from the roof.
- Cleaned the cobwebs from the warming house furnace & turned it on for the day; it's set to go when the winter ski season arrives.
Many thanks to our work day volunteers: Sam Behrends, Dan Bjugstad, Carolyn Chatterton, Roger Gray, John Kann, Jenna Lisowe, Dave Olsen, Jan Paulsen, Tom Paulsen, Steve P, Steve Schleppegrell, Jerry Schneider, Jonathan Stanley, Phil Strop, John Waldron, Cathie Woita, Paul Woita, and John Ziemer.


It's cold outside, there's lots of snow on the ground, now's a good time to get psyched for skiing. Check out the following slide show video showing ten years of fun on the Blue Hills Trail. Get your skis waxed, come ski the Hills!
Grab a cup of coffee or hot chocolate, adjust your volume control, then sit back and follow the fun. See anyone you know?
Post Categories
Blue Hills Trail
instagram updates
Subscribe to Newsletter Updates
Stay in-the-know about grooming updates, special events, news, announcements, volunteer days, and more. Rest-assured, we never sell or share your information.

